Why a good specification saves time
A reactor enquiry that leaves out the design pressure, the material or the heat duty comes back with assumptions, and offers from different suppliers cannot be compared. Worse, a reactor built on the wrong assumption can be expensive to change. The checklist below covers what a reactor supplier needs to know. You do not need every item to start a conversation, but the more you can give, the closer the first offer will be to the final design.
1. Volume
State the working volume, the batch size and its density, and the range of levels the reactor will run at. Allow space above the liquid for foaming, gas held up in the liquid during gas reactions, and vapour disengagement; the supplier will then propose the gross volume. Say also if the reactor must work with a small heel or a part batch, because that decides where the bottom impeller must sit.
2. Pressure, vacuum and temperature
Give the operating pressure and temperature range, and the design pressure and temperature, which include a margin for upsets. State whether the reactor will run under vacuum, even briefly, for example during distillation or when a hot vessel cools down closed. Vacuum design affects the shell thickness and stiffening. If your plant requires a particular design code, name it.
3. Materials of construction
Name the material if you know it, or describe the chemistry so that the supplier can propose one: the reactants, solvents, acids or alkalis, chlorides, the temperature and the cleaning chemicals. Stainless steels 304 and 316 / 316L cover many duties; chlorides at temperature, strong acids and some solvents call for higher alloys. State any requirements for internal surface finish, for example for products that stick or for hygienic duty.
4. Heating and cooling
Describe the temperature profile: heat-up, reaction and cool-down, with the time allowed for each, and the heat of reaction if there is one. List the heating and cooling media available on site, with their temperatures and pressures: steam, thermic oil, hot water, cooling tower water, chilled water. The supplier will choose between a jacket, a limpet coil, a dimple jacket and internal coils. Our guide jacket vs limpet coil vs dimple jacket explains the options.
5. What the agitator must do
Describe the product through the batch, not just at the start: viscosity at each stage, solids that are added, formed or dissolved, gases that are added, and whether two liquid phases must be dispersed. State the mixing objective at each stage: blending, solids suspension, gas dispersion, emulsification or heat transfer. A batch that thickens from a thin liquid to a paste needs a very different agitator from one that stays thin.
6. Shaft seal and drive
State the seal you prefer, or the information needed to choose one: pressure, vacuum, vapour, toxicity and whether any leakage to atmosphere is acceptable. Single mechanical seals suit many closed reactors; double mechanical seals with a barrier fluid system are used for toxic, flammable or pressurised duty. Give the preferred motor make, power supply, whether a variable speed drive is wanted, and the hazardous-area classification of the location.
7. Nozzles, instruments and fittings
List the process connections if you have them: feed and vent nozzles, charging nozzle for solids, reflux and vapour lines, temperature and pressure instruments, level measurement, sampling, sight glass and light, manhole, rupture disc or safety valve, and the bottom outlet valve. If you do not have a nozzle list yet, describe what goes in and out of the reactor and the supplier will propose one.
8. Supports, access and installation
Say how the reactor will be supported: on legs, on lugs from a structure, or on a skirt. Note any limits on height, diameter or weight from the building, the floor or the crane, and the headroom needed to lift the agitator out for maintenance. If the reactor is to be weighed, the supports have to be designed for load cells.
9. Insulation and finish
State whether the reactor is to be insulated, the insulation material and cladding, and any external finish or painting requirements. For hot reactors, insulation also protects operators.
10. Documents and inspection
List the documents you need: general arrangement drawing for approval, agitator datasheet, material certificates, test records, and the inspection and testing to be witnessed. Agreeing these at the enquiry stage avoids delays at dispatch.
Checklist at a glance
| Item | What to give |
|---|---|
| Volume | Working volume, batch size, density, level range |
| Design conditions | Operating and design pressure, vacuum, temperature, design code if required |
| Material | Material, or the chemistry and cleaning chemicals |
| Heating and cooling | Temperature profile, heat of reaction, media available |
| Agitator duty | Viscosity through the batch, solids, gas, mixing objective |
| Seal and drive | Seal type, motor make, power supply, speed control, area classification |
| Nozzles and instruments | Nozzle list, or a description of what goes in and out |
| Installation | Supports, size and weight limits, headroom, weighing |
| Documents | Drawings, datasheets, certificates, inspection and tests |
Send it to us
FMT designs and builds agitated stainless steel reactors, with jackets, limpet coils or dimple jackets, and the agitator designed with the vessel. Send what you have, even if it is only a process description, and we will reply with the questions that matter for your reactor. See chemical reactors or send an enquiry.